Search icon

Kia Sonet Waiting Period in India (2024)

Published on 25 Jun, 2024, 5:22 AM IST
Updated on 27 Jun, 2024, 9:26 AM IST
logo.jpeg
Team Acko Drive
ReadTimeIcon
7 min read
Interesting Articles
Follow us onfollow-google-news-icon

Share Post

Kia introduced the Sonet SUV to Indian consumers back in 2020 to much acclaim. The Kia Sonet is a chic and adaptable five-seater compact SUV that provides a decent blend of features, driving dynamics, and design aspects. It leveraged the existing preference for dynamic SUVs and solidified its position within months. The Kia Sonet comes with an eye-catching exterior design language and an equally appealing cabin space with cutting-edge features and comfort amenities. 

The Kia Sonet offers three different engine options. It gets a 1.2-litre naturally aspirating petrol engine paired with a 5-speed MT, a 1.0-litre turbo-petrol version paired to either a 6-speed iMT or a 7-speed DCT, and a 1.5-litre diesel version mated to either a 6-speed MT, 6-speed iMT or a 6-speed AMT. The Smartstream G1.2 engine offers a power of 81.8bhp@6000rpm and torque of 81.8bhp@6000rpm. The Smartstream G1.0 TGDi engine offers 118bhp@6000rpm power and 172Nm@1500-4000rpm torque, while the 1.5L CRDi VGT diesel engine offers 114bhp@4000rpm power and 250Nm@1500-2750rpm torque. 

The Sonet's demand can also be attributed to its fuel efficiency. The ARAI claimed mileage for the naturally aspirated petrol engine is 18.83 km/l. The mileage range for the turbo petrol engine is 18.7 km/l to 19.2 km/l, while that of the diesel engine is 18.6 km/l to 22.3 km/l. 

This promising combination of design, power, and performance has made the Sonet a much-preferred car. As more people choose the Sonet, there are concerns regarding the waiting periods. 

Kia

Contents
ArrowUpGrey icon

Kia Sonet Waiting Period

Since its inception on September 18, 2020, to the end of February 2024, the Sonet has recorded 304,311 units of wholesale sales in the Indian market. In addition to exporting 86,780 units, Kia Sonet has sold 391,091 units overall, falling 8,909 units short of the 400,000-unit milestone at this point. 

In less than a year after its inception, it achieved the milestone of 100,000 units sold. In June 2022, the sales milestone of 150,000 units was reached. 33 months after commencement, in May 2023, the 250,000-unit milestone was reached. It took nine months to go from 250,000 to 300,000 units. 

These numbers clearly show the demand for the Sonet and why there is a waiting period. The standard waiting period for the Sonet ranges from just over a month to even eight months or more. The approximate dates depend on the city and the variant chosen. 

Kia Sonet Waiting Period in Delhi

The following table offers the estimated waiting period for Kia Sonet in Delhi. 

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

56 Days

1.0 HTK Plus iMT

35 Days

1.0 HTX DCT

35 Days

1.0 HTX iMT

35 Days

1.0 HTX Plus iMT

35 Days

1.0 X Line DCT

35 Days

1.2 THE

35 Days

1.2 HTK

56 Days

1.2 HTK Plus

35 Days

1.5 GTX Plus AT

35 Days

1.5 THE

56 Days

1.5 HTK

56 Days

1.5 HTK Plus

56 Days

1.5 HTX

56 Days

1.5 HTX AT

35 Days

1.5 HTX iMT

35 Days

1.5 HTX Plus

56 Days

1.5 HTX Plus iMT

35 Days

1.5 X Line AT

35 Days

Check out: Kia Sonet Variants

Kia Sonet Waiting Period in Gurgaon

The waiting period for Kia Sonet in Gurgaon based on the variants is presented in the table below. 

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

56 Days

1.0 HTK Plus iMT

35 Days

1.0 HTX DCT

35 Days

1.0 HTX iMT

35 Days

1.0 HTX Plus iMT

35 Days

1.0 X Line DCT

35 Days

1.2 THE

35 Days

1.2 HTK

56 Days

1.2 HTK Plus

35 Days

1.5 GTX Plus AT

35 Days

1.5 THE

56 Days

1.5 HTK

56 Days

1.5 HTK Plus

56 Days

1.5 HTX

56 Days

1.5 HTX AT

35 Days

1.5 HTX iMT

35 Days

1.5 HTX Plus

56 Days

1.5 HTX Plus iMT

35 Days

1.5 X Line AT

35 Days

Kia Sonet Waiting Period in Faridabad

The table below enlists the waiting periods for each Kia Sonet variant available in Faridabad.

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

56 Days

1.0 HTK Plus iMT

35  Days

1.0 HTX DCT

35 Days

1.0 HTX iMT

35 Days

1.0 HTX Plus iMT

35 Days

1.0 X Line DCT

35 Days

1.2 THE

35 Days

1.2 HTK

56 Days

1.2 HTK Plus

35 Days

1.5 GTX Plus AT

35 Days

1.5 THE

56 Days

1.5 HTK

56 Days

1.5 HTK Plus

56 Days

1.5 HTX

56 Days

1.5 HTX AT

35 Days

1.5 HTX iMT

35 Days

1.5 HTX Plus

56 Days

1.5 HTX Plus iMT

35 Days

1.5 X Line AT

35 Days

Also Read: Kia Sonet All Specifications

Kia Sonet Waiting Period in Noida

The waiting time for Kia Sonet in Noida is listed below.

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

56 Days

1.0 HTK Plus iMT

35 Days

1.0 HTX DCT

35 Days

1.0 HTX iMT

35 Days

1.0 HTX Plus iMT

35 Days

1.0 X Line DCT

35 Days

1.2 THE

35 Days

1.2 HTK

56 Days

1.2 HTK Plus

35 Days

1.5 GTX Plus AT

35 Days

1.5 THE

56 Days

1.5 HTK

56 Days

1.5 HTK Plus

56 Days

1.5 HTX

56 Days

1.5 HTX AT

35 Days

1.5 HTX iMT

35 Days

1.5 HTX Plus

56 Days

1.5 HTX Plus iMT

35 Days

1.5 X Line AT

35 Days

Kia Sonet Waiting Period in Ghaziabad

In Ghaziabad, you can get your Kia Sonet delivered in approximately one to two months. The variant-wise expected waiting time is listed in the table below:

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

56 Days

1.0 HTK Plus iMT

35 Days

1.0 HTX DCT

35 Days

1.0 HTX iMT

35 Days

1.0 HTX Plus iMT

35 Days

1.0 X Line DCT

35 Days

1.2 THE

35 Days

1.2 HTK

56 Days

1.2 HTK Plus

35 Days

1.5 GTX Plus AT

35 Days

1.5 THE

56 Days

1.5 HTK

56 Days

1.5 HTK Plus

56 Days

1.5 HTX

56 Days

1.5 HTX AT

35 Days

1.5 HTX iMT

35 Days

1.5 HTX Plus

56 Days

1.5 HTX Plus iMT

35 Days

1.5 X Line AT

35 Days

Read More: Kia Sonet Dimensions

Kia Sonet Waiting Period in Bangalore

The estimated waiting period for Kia Sonet in Bangalore is listed below.

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

70 Days

1.0 HTK Plus iMT

70 Days

1.0 HTX DCT

70 Days

1.0 HTX iMT

70 Days

1.0 HTX Plus iMT

70 Days

1.0 X Line DCT

70 Days

1.2 THE

70 Days

1.2 HTK

70 Days

1.2 HTK Plus

70 Days

1.5 GTX Plus AT

70 Days

1.5 THE

70 Days

1.5 HTK

70 Days

1.5 HTK Plus

70 Days

1.5 HTX

70 Days

1.5 HTX AT

70 Days

1.5 HTX iMT

70 Days

1.5 HTX Plus

70 Days

1.5 HTX Plus iMT

70 Days

1.5 X Line AT

70 Days

Kia Sonet Waiting Period in Mumbai

The waiting time for Kia Sonet for customers in Mumbai is compiled and presented below. 

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

56 Days

1.0 HTK Plus iMT

35 Days

1.0 HTX DCT

35 Days

1.0 HTX iMT

35 Days

1.0 HTX Plus iMT

35 Days

1.0 X Line DCT

35 Days

1.2 THE

35 Days

1.2 HTK

56 Days

1.2 HTK Plus

35 Days

1.5 GTX Plus AT

35 Days

1.5 THE

56 Days

1.5 HTK

56 Days

1.5 HTK Plus

56 Days

1.5 HTX

56 Days

1.5 HTX AT

35 Days

1.5 HTX iMT

35 Days

1.5 HTX Plus

56 Days

1.5 HTX Plus iMT

35 Days

1.5 X Line AT

35 Days

Kia Sonet Waiting Period in Pune

The table below shows the waiting periods for all Kia Sonet variants available in Pune.

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

84 Days

1.0 HTK Plus iMT

56 Days

1.0 HTX DCT

84 Days

1.0 HTX iMT

56 Days

1.0 HTX Plus iMT

56 Days

1.0 X Line DCT

84 Days

1.2 THE

42 Days

1.2 HTK

42 Days

1.2 HTK Plus

42 Days

1.5 GTX Plus AT

56 Days

1.5 THE

56 Days

1.5 HTK

56 Days

1.5 HTK Plus

56 Days

1.5 HTX

56 Days

1.5 HTX AT

56 Days

1.5 HTX iMT

56 Days

1.5 HTX Plus

56 Days

1.5 HTX Plus iMT

56 Days

1.5 X Line AT

56 Days

Kia Sonet Waiting Period in Chennai

The waiting period for Chennai customers for the Sonet is provided below.

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

56 Days

1.0 HTK Plus iMT

56 Days

1.0 HTX DCT

56 Days

1.0 HTX iMT

56 Days

1.0 HTX Plus iMT

56 Days

1.0 X Line DCT

56 Days

1.2 THE

56 Days

1.2 HTK

56 Days

1.2 HTK Plus

56 Days

1.5 GTX Plus AT

84 Days

1.5 THE

84 Days

1.5 HTK

84 Days

1.5 HTK Plus

84 Days

1.5 HTX

84 Days

1.5 HTX AT

84 Days

1.5 HTX iMT

84 Days

1.5 HTX Plus

84 Days

1.5 HTX Plus iMT

84 Days

1.5 X Line AT

84 Days

Kia Sonet Waiting Period in Hyderabad

A variant-wise listing of the Kia Sonet waiting periods in Hyderabad is provided in the table below:

Variant

ACKO Drive's Waiting Period*

1.0 GTX Plus DCT

245 Days

1.0 HTK Plus iMT

112 Days

1.0 HTX DCT

280 Days

1.0 HTX iMT

112 Days

1.0 HTX Plus iMT

112 Days

1.0 X Line DCT

210 Days

1.2 THE

84 Days

1.2 HTK

84 Days

1.2 HTK Plus

84 Days

1.5 GTX Plus AT

189 Days

1.5 THE

175 Days

1.5 HTK

175 Days

1.5 HTK Plus

112 Days

1.5 HTX

189 Days

1.5 HTX AT

245 Days

1.5 HTX iMT

189 Days

1.5 HTX Plus

189 Days

1.5 HTX Plus iMT

189 Days

1.5 X Line AT

189 Days

*Subject to availability or till the stocks last.

FAQs

Here are some of the most common questions and their answers related to Kia Sonet Waiting Period in India

Icon
What is the waiting period for Kia Sonet in India?

The waiting period for Kia Sonet in Delhi, Mumbai, Gurgaon, Faridabad, Ghaziabad, and Noida is 35 days to 56 days, while in Bangalore, it is 70 days. For Pune, the waiting period is 42 days to 84 days; for Chennai, it is 56 days to 84 days; and for Hyderabad, the waiting period is a bit longer, 84 days to 280 days, depending on the variant. 

Is the Kia Sonet a good car to buy?

The Kia Sonet experience is excellent. The car has a fantastic road presence and looks dynamic. The excellent mileage, smooth engine refinement, and extras make the wait worthwhile.

Is Kia Sonet a success?

Kia Sonet is a huge success in the automobile sector. The Sonet has recorded 304,311 units of wholesale sales in the Indian market. In less than a year after its inception, it achieved the milestone of 100,000 units sold. In just 33 months after commencement, in May 2023, the 250,000-unit milestone was reached. It took nine months to go from 250,000 to 300,000 units.

What is the waiting period for the Kia Sonet 1.5 HTK in Hyderabad?

Customers in Hyderabad have to wait for about 175 days to get their Sonet 1.5 HTK delivered.

AckoDriveTag IconTags
car guide

RecentArticles

Mahindra XUV700 Safety Rating 2024: All You Need to Know

Team Ackodrive 11 Dec, 2024, 5:17 AM IST

BH Number Plate in Odisha

Team Ackodrive 10 Dec, 2024, 6:27 PM IST

Tata Tigor Safety Rating 2024: All You Need to Know

Team Ackodrive 9 Dec, 2024, 7:18 AM IST

Honda Amaze Safety Rating 2024: All You Need to Know

Team Ackodrive 9 Dec, 2024, 6:27 AM IST

Looking for a new car?

We promise the best car deals and earliest delivery!

Callback Widget Desktop Icon