Mahindra BE 6 Waiting Period
The Mahindra BE 6 is offered with two battery pack options, i.e., 59 kWh and 79 kWh, delivering a claimed range of up to 683 km on a single charge, depending on the variant. The electric SUV produces up to 282 bhp and 380 Nm of torque, offering strong acceleration and smooth performance typical of modern EVs. Built on Mahindra’s INGLO electric platform, the BE 6 focuses heavily on technology and comfort, featuring a premium interior, connected-car features, advanced driver-assistance systems (ADAS), and fast-charging capability that can bring the battery from 20% to 80% in about 20 minutes with a DC fast charger.
Because of its strong performance, long range, and feature-rich package, the BE 6 has generated significant demand among EV buyers. As a result, waiting periods can vary depending on the variant, battery pack, colour choice, and city. Some configurations may be delivered sooner, while higher trims or long-range versions could involve longer waiting periods.
Mahindra BE 6 Waiting Period in Delhi
The good news is that in Delhi, the waiting period for the Mahindra BE 6 is currently the same across all variants. So buyers can expect a similar delivery timeline regardless of the version chosen.
Variant | ACKO Drive's Waiting Period* |
|---|
FE2 | 90 Days |
FE3 | 90 Days |
Pack One | 90 Days |
Pack One 7.2 kW Charger | 90 Days |
Pack One Above | 90 Days |
Pack One Above 7.2 kW Charger | 90 Days |
Pack One Above No Charger | 90 Days |
Pack One No Charger | 90 Days |
Pack Three | 90 Days |
Pack Three 7.2 kW Charger | 90 Days |
Pack Three No Charger | 90 Days |
Pack Three Select | 90 Days |
Pack Three Select 7.2 kW Charger | 90 Days |
Pack Three Select No Charger | 90 Days |
Pack Two | 90 Days |
Pack Two 7.2 kW Charger | 90 Days |
Pack Two 79kWh | 90 Days |
Pack Two 79kWh 7.2 kW Charger | 90 Days |
Pack Two 79kWh No Charger | 90 Days |
Pack Two No Charger | 90 Days |
Mahindra BE 6 Waiting Period in Gurgaon
Buyers in Gurgaon can also expect a uniform delivery period across all BE 6 variants. You can refer to the following table for the latest Mahindra BE 6 waiting period in Gurgain:
Variant | ACKO Drive's Waiting Period* |
|---|
FE2 | 90 Days |
FE3 | 90 Days |
Pack One | 90 Days |
Pack One 7.2 kW Charger | 90 Days |
Pack One Above | 90 Days |
Pack One Above 7.2 kW Charger | 90 Days |
Pack One Above No Charger | 90 Days |
Pack One No Charger | 90 Days |
Pack Three | 90 Days |
Pack Three 7.2 kW Charger | 90 Days |
Pack Three No Charger | 90 Days |
Pack Three Select | 90 Days |
Pack Three Select 7.2 kW Charger | 90 Days |
Pack Three Select No Charger | 90 Days |
Pack Two | 90 Days |
Pack Two 7.2 kW Charger | 90 Days |
Pack Two 79kWh | 90 Days |
Pack Two 79kWh 7.2 kW Charger | 90 Days |
Pack Two 79kWh No Charger | 90 Days |
Pack Two No Charger | 90 Days |
Mahindra BE 6 Waiting Period in Faridabad
The Mahindra BE 6 continues to see a steady demand across variants in Faridabad. The table below provides a quick breakdown of the Mahindra BE 6 waiting period in Faridabad:
Variant | ACKO Drive's Waiting Period* |
|---|
FE2 | 90 Days |
FE3 | 90 Days |
Pack One | 90 Days |
Pack One 7.2 kW Charger | 90 Days |
Pack One Above | 90 Days |
Pack One Above 7.2 kW Charger | 90 Days |
Pack One Above No Charger | 90 Days |
Pack One No Charger | 90 Days |
Pack Three | 90 Days |
Pack Three 7.2 kW Charger | 90 Days |
Pack Three No Charger | 90 Days |
Pack Three Select | 90 Days |
Pack Three Select 7.2 kW Charger | 90 Days |
Pack Three Select No Charger | 90 Days |
Pack Two | 90 Days |
Pack Two 7.2 kW Charger | 90 Days |
Pack Two 79kWh | 90 Days |
Pack Two 79kWh 7.2 kW Charger | 90 Days |
Pack Two 79kWh No Charger | 90 Days |
Pack Two No Charger | 90 Days |
Mahindra BE 6 Waiting Period in Noida
In Noida, the BE 6 has a standard waiting period across all variants as well. This means the delivery timelines remain consistent throughout the lineup. The following table denotes the latest Mahindra BE 6 waiting period in Noida:
Variant | ACKO Drive's Waiting Period* |
|---|
FE2 | 90 Days |
FE3 | 90 Days |
Pack One | 90 Days |
Pack One 7.2 kW Charger | 90 Days |
Pack One Above | 90 Days |
Pack One Above 7.2 kW Charger | 90 Days |
Pack One Above No Charger | 90 Days |
Pack One No Charger | 90 Days |
Pack Three | 90 Days |
Pack Three 7.2 kW Charger | 90 Days |
Pack Three No Charger | 90 Days |
Pack Three Select | 90 Days |
Pack Three Select 7.2 kW Charger | 90 Days |
Pack Three Select No Charger | 90 Days |
Pack Two | 90 Days |
Pack Two 7.2 kW Charger | 90 Days |
Pack Two 79kWh | 90 Days |
Pack Two 79kWh 7.2 kW Charger | 90 Days |
Pack Two 79kWh No Charger | 90 Days |
Pack Two No Charger | 90 Days |
Mahindra BE 6 Waiting Period in Ghaziabad
Just like Noida and Delhi, the waiting period for the Mahindra BE 6 in Ghaziabad remains quite consistent. Take a look at the variant-wise breakdown here:
Variant | ACKO Drive's Waiting Period* |
|---|
FE2 | 90 Days |
FE3 | 90 Days |
Pack One | 90 Days |
Pack One 7.2 kW Charger | 90 Days |
Pack One Above | 90 Days |
Pack One Above 7.2 kW Charger | 90 Days |
Pack One Above No Charger | 90 Days |
Pack One No Charger | 90 Days |
Pack Three | 90 Days |
Pack Three 7.2 kW Charger | 90 Days |
Pack Three No Charger | 90 Days |
Pack Three Select | 90 Days |
Pack Three Select 7.2 kW Charger | 90 Days |
Pack Three Select No Charger | 90 Days |
Pack Two | 90 Days |
Pack Two 7.2 kW Charger | 90 Days |
Pack Two 79kWh | 90 Days |
Pack Two 79kWh 7.2 kW Charger | 90 Days |
Pack Two 79kWh No Charger | 90 Days |
Pack Two No Charger | 90 Days |
Mahindra BE 6 Waiting Period in Bangalore
Much like Delhi NCR, Bangalore also offers a uniform waiting period across all Mahindra BE 6 variants, currently up to 3 months. Check it out:
Variant | ACKO Drive's Waiting Period* |
|---|
FE2 | 90 Days |
FE3 | 90 Days |
Pack One | 90 Days |
Pack One 7.2 kW Charger | 90 Days |
Pack One Above | 90 Days |
Pack One Above 7.2 kW Charger | 90 Days |
Pack One Above No Charger | 90 Days |
Pack One No Charger | 90 Days |
Pack Three | 90 Days |
Pack Three 7.2 kW Charger | 90 Days |
Pack Three No Charger | 90 Days |
Pack Three Select | 90 Days |
Pack Three Select 7.2 kW Charger | 90 Days |
Pack Three Select No Charger | 90 Days |
Pack Two | 90 Days |
Pack Two 7.2 kW Charger | 90 Days |
Pack Two 79kWh | 90 Days |
Pack Two 79kWh 7.2 kW Charger | 90 Days |
Pack Two 79kWh No Charger | 90 Days |
Pack Two No Charger | 90 Days |
Mahindra BE 6 Waiting Period in Mumbai
Unlike Delhi NCR, buyers in Mumbai can expect varying waiting periods across the Mahindra BE 6 lineup, depending on the variant of choice. The table below offers a quick breakdown of the BE 6 waiting period in Mumbai:
Variant | ACKO Drive's Waiting Period* |
|---|
FE2 | 90 Days |
FE3 | 90 Days |
Pack One | 120 Days |
Pack One 7.2 kW Charger | 120 Days |
Pack One Above | 120 Days |
Pack One Above 7.2 kW Charger | 120 Days |
Pack One Above No Charger | 120 Days |
Pack One No Charger | 120 Days |
Pack Three | 120 Days |
Pack Three 7.2 kW Charger | 120 Days |
Pack Three No Charger | 120 Days |
Pack Three Select | 120 Days |
Pack Three Select 7.2 kW Charger | 120 Days |
Pack Three Select No Charger | 120 Days |
Pack Two | 120 Days |
Pack Two 7.2 kW Charger | 120 Days |
Pack Two 79kWh | 300 Days |
Pack Two 79kWh 7.2 kW Charger | 300 Days |
Pack Two 79kWh No Charger | 300 Days |
Pack Two No Charger | 120 Days |
Mahindra BE 6 Waiting Period in Pune
Much like Mumbai, buyers in Pune face varying waiting periods across all the BE 6 offerings. Here’s an overview of the Mahindra BE 6 waiting period in Pune:
Variant | ACKO Drive's Waiting Period* |
|---|
FE2 | 90 Days |
FE3 | 90 Days |
Pack One | 120 Days |
Pack One 7.2 kW Charger | 120 Days |
Pack One Above | 120 Days |
Pack One Above 7.2 kW Charger | 120 Days |
Pack One Above No Charger | 120 Days |
Pack One No Charger | 120 Days |
Pack Three | 120 Days |
Pack Three 7.2 kW Charger | 120 Days |
Pack Three No Charger | 120 Days |
Pack Three Select | 120 Days |
Pack Three Select 7.2 kW Charger | 120 Days |
Pack Three Select No Charger | 120 Days |
Pack Two | 120 Days |
Pack Two 7.2 kW Charger | 120 Days |
Pack Two 79kWh | 300 Days |
Pack Two 79kWh 7.2 kW Charger | 300 Days |
Pack Two 79kWh No Charger | 300 Days |
Pack Two No Charger | 120 Days |
Mahindra BE 6 Waiting Period in Hyderabad
Hyderabad currently offers some of the shortest waiting periods for the Mahindra BE 6, with certain variants available in under 2 months, depending on availability. Take a look here:
Variant | ACKO Drive's Waiting Period* |
|---|
FE2 | 90 Days |
FE3 | 90 Days |
Pack One | 42 Days |
Pack One 7.2 kW Charger | 42 Days |
Pack One Above | 42 Days |
Pack One Above 7.2 kW Charger | 42 Days |
Pack One Above No Charger | 42 Days |
Pack One No Charger | 42 Days |
Pack Three | 42 Days |
Pack Three 7.2 kW Charger | 42 Days |
Pack Three No Charger | 42 Days |
Pack Three Select | 42 Days |
Pack Three Select 7.2 kW Charger | 42 Days |
Pack Three Select No Charger | 42 Days |
Pack Two | 42 Days |
Pack Two 7.2 kW Charger | 42 Days |
Pack Two 79kWh | 42 Days |
Pack Two 79kWh 7.2 kW Charger | 42 Days |
Pack Two 79kWh No Charger | 42 Days |
Pack Two No Charger | 42 Days |
*Subject to car availability or till the stocks last.
Disclaimer: The waiting periods listed above are indicative and not guaranteed. Your actual wait time may vary depending on factors such as variant, colour, powertrain choice, and dealership location. Production availability and demand can also impact delivery.
Frequently Asked Questions