Mahindra Scorpio N Waiting Period
As of February 2025, the Mahindra Scorpio N has sold 13,618 units, contributing to its high demand and subsequent waiting period. The total units sold in the first two months of 2025 amount to 29,060 units (15,442 in January and 13,618 in February).
The waiting period for the Scorpio N varies across variants, with some reaching up to 7 weeks. Factors contributing to this waiting period include high demand, production constraints, and supply chain dynamics. The Scorpio N's popularity, coupled with its robust features and powerful engine options, maintains its strong market presence.
The Mahindra Scorpio N is offered in 34 variants, each with a waiting period that can range from several months to over a year. Its captivating design, robust off-road capabilities, and modern features have made it highly sought after in the Indian car market. Potential buyers should anticipate varying waiting times based on their location and the specific variant chosen. For precise and up-to-date information on the Scorpio N waiting period in major cities like Mumbai, Delhi, Noida, Bangalore, and Pune, it's advisable to consult local dealerships for the most accurate details.
Mahindra Scorpio N Waiting Period in Delhi
Here are the waiting periods for each Scorpio N variant available in Delhi:
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 378 Days |
2.0 Z2 Petrol (E) | 378 Days |
2.0 Z4 AT Petrol | 455 Days |
2.0 Z4 Petrol | 455 Days |
2.0 Z4 Petrol (E) | 455 Days |
2.0 Z8 AT Petrol | 420 Days |
2.0 Z8 Petrol | 420 Days |
2.0 Z8L AT Petrol | 182 Days |
2.0 Z8L AT Petrol 6 STR | 182 Days |
2.0 Z8L Petrol | 406 Days |
2.0 Z8L Petrol 6 STR | 406 Days |
2.2 Z2 Diesel | 378 Days |
2.2 Z2 Diesel (E) | 378 Days |
2.2 Z4 4WD Diesel | 455 Days |
2.2 Z4 4WD Diesel (E) | 455 Days |
2.2 Z4 AT Diesel | 455 Days |
2.2 Z4 Diesel | 455 Days |
2.2 Z4 Diesel (E) | 455 Days |
2.2 Z6 AT Diesel | 420 Days |
2.2 Z6 Diesel | 420 Days |
2.2 Z8 4WD AT Diesel | 420 Days |
2.2 Z8 4WD Diesel | 420 Days |
2.2 Z8 AT Diesel | 420 Days |
2.2 Z8 Diesel | 420 Days |
2.2 Z8L 4WD AT Diesel | 182 Days |
2.2 Z8L 4WD Diesel | 406 Days |
2.2 Z8L AT Diesel | 182 Days |
2.2 Z8L AT Diesel 6 STR | 182 Days |
2.2 Z8L Diesel | 406 Days |
2.2 Z8L Diesel 6 STR | 406 Days |
Check out: Mahindra Scorpio N Variants
Mahindra Scorpio N Waiting Period in Pune
The table below outlines the expected delivery times for customers in Pune booking different Scorpio N variants:
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 365 Days |
2.0 Z2 Petrol (E) | 365 Days |
2.0 Z4 AT Petrol | 180 Days |
2.0 Z4 Petrol | 365 Days |
2.0 Z4 Petrol (E) | 365 Days |
2.0 Z8 AT Petrol | 180 Days |
2.0 Z8 Petrol | 365 Days |
2.0 Z8L AT Petrol | 180 Days |
2.0 Z8L AT Petrol 6 STR | 180 Days |
2.0 Z8L Petrol | 365 Days |
2.0 Z8L Petrol 6 STR | 365 Days |
2.2 Z2 Diesel | 365 Days |
2.2 Z2 Diesel (E) | 365 Days |
2.2 Z4 4WD Diesel | 365 Days |
2.2 Z4 4WD Diesel (E) | 365 Days |
2.2 Z4 AT Diesel | 180 Days |
2.2 Z4 Diesel | 365 Days |
2.2 Z4 Diesel (E) | 365 Days |
2.2 Z6 AT Diesel | 180 Days |
2.2 Z6 Diesel | 365 Days |
2.2 Z8 4WD AT Diesel | 180 Days |
2.2 Z8 4WD Diesel | 365 Days |
2.2 Z8 AT Diesel | 180 Days |
2.2 Z8 Diesel | 365 Days |
2.2 Z8L 4WD AT Diesel | 180 Days |
2.2 Z8L 4WD Diesel | 365 Days |
2.2 Z8L AT Diesel | 180 Days |
2.2 Z8L AT Diesel 6 STR | 180 Days |
2.2 Z8L Diesel | 365 Days |
2.2 Z8L Diesel 6 STR | 365 Days |
Mahindra Scorpio N Waiting Period in Bangalore
Customers in Bangalore can refer to the table below for the expected delivery dates of different Scorpio N variants.
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 700 Days |
2.0 Z2 Petrol (E) | 700 Days |
2.0 Z4 AT Petrol | 700 Days |
2.0 Z4 Petrol | 700 Days |
2.0 Z4 Petrol (E) | 700 Days |
2.0 Z8 AT Petrol | 700 Days |
2.0 Z8 Petrol | 700 Days |
2.0 Z8L AT Petrol | 700 Days |
2.0 Z8L AT Petrol 6 STR | 700 Days |
2.0 Z8L Petrol | 700 Days |
2.0 Z8L Petrol 6 STR | 700 Days |
2.2 Z2 Diesel | 700 Days |
2.2 Z2 Diesel (E) | 700 Days |
2.2 Z4 4WD Diesel | 700 Days |
2.2 Z4 4WD Diesel (E) | 700 Days |
2.2 Z4 AT Diesel | 700 Days |
2.2 Z4 Diesel | 700 Days |
2.2 Z4 Diesel (E) | 700 Days |
2.2 Z6 AT Diesel | 700 Days |
2.2 Z6 Diesel | 700 Days |
2.2 Z8 4WD AT Diesel | 700 Days |
2.2 Z8 4WD Diesel | 700 Days |
2.2 Z8 AT Diesel | 700 Days |
2.2 Z8 Diesel | 700 Days |
2.2 Z8L 4WD AT Diesel | 700 Days |
2.2 Z8L 4WD Diesel | 700 Days |
2.2 Z8L AT Diesel | 700 Days |
2.2 Z8L AT Diesel 6 STR | 700 Days |
2.2 Z8L Diesel | 700 Days |
2.2 Z8L Diesel 6 STR | 700 Days |
Also Read: Mahindra Scorpio N All Specifications
Mahindra Scorpio N Waiting Period in Faridabad
The following table shows the estimated waiting period for Faridabad customers to get the delivery of their desired Scorpio N variant:
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 90 Days |
2.0 Z2 Petrol (E) | 90 Days |
2.0 Z4 AT Petrol | 90 Days |
2.0 Z4 Petrol | 90 Days |
2.0 Z4 Petrol (E) | 90 Days |
2.0 Z8 AT Petrol | 90 Days |
2.0 Z8 Petrol | 90 Days |
2.0 Z8L AT Petrol | 90 Days |
2.0 Z8L AT Petrol 6 STR | 90 Days |
2.0 Z8L Petrol | 90 Days |
2.0 Z8L Petrol 6 STR | 90 Days |
2.2 Z2 Diesel | 90 Days |
2.2 Z2 Diesel (E) | 90 Days |
2.2 Z4 4WD Diesel | 90 Days |
2.2 Z4 4WD Diesel (E) | 90 Days |
2.2 Z4 AT Diesel | 90 Days |
2.2 Z4 Diesel | 90 Days |
2.2 Z4 Diesel (E) | 90 Days |
2.2 Z6 AT Diesel | 90 Days |
2.2 Z6 Diesel | 90 Days |
2.2 Z8 4WD AT Diesel | 90 Days |
2.2 Z8 4WD Diesel | 90 Days |
2.2 Z8 AT Diesel | 90 Days |
2.2 Z8 Diesel | 90 Days |
2.2 Z8L 4WD AT Diesel | 90 Days |
2.2 Z8L 4WD Diesel | 90 Days |
2.2 Z8L AT Diesel | 90 Days |
2.2 Z8L AT Diesel 6 STR | 90 Days |
2.2 Z8L Diesel | 90 Days |
2.2 Z8L Diesel 6 STR | 90 Days |
Mahindra Scorpio N Waiting Period in Noida
Highlighted in the table below are the expected waiting timelines for Noida customers to receive their chosen Scorpio N variant:
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 365 Days |
2.0 Z2 Petrol (E) | 90 Days |
2.0 Z4 AT Petrol | 365 Days |
2.0 Z4 Petrol | 365 Days |
2.0 Z4 Petrol (E) | 90 Days |
2.0 Z8 AT Petrol | 365 Days |
2.0 Z8 Petrol | 365 Days |
2.0 Z8L AT Petrol | 365 Days |
2.0 Z8L AT Petrol 6 STR | 365 Days |
2.0 Z8L Petrol | 365 Days |
2.0 Z8L Petrol 6 STR | 365 Days |
2.2 Z2 Diesel | 365 Days |
2.2 Z2 Diesel (E) | 90 Days |
2.2 Z4 4WD Diesel | 365 Days |
2.2 Z4 4WD Diesel (E) | 90 Days |
2.2 Z4 AT Diesel | 365 Days |
2.2 Z4 Diesel | 365 Days |
2.2 Z4 Diesel (E) | 90 Days |
2.2 Z6 AT Diesel | 365 Days |
2.2 Z6 Diesel | 365 Days |
2.2 Z8 4WD AT Diesel | 365 Days |
2.2 Z8 4WD Diesel | 365 Days |
2.2 Z8 AT Diesel | 365 Days |
2.2 Z8 Diesel | 365 Days |
2.2 Z8L 4WD AT Diesel | 365 Days |
2.2 Z8L 4WD Diesel | 365 Days |
2.2 Z8L AT Diesel | 365 Days |
2.2 Z8L AT Diesel 6 STR | 365 Days |
2.2 Z8L Diesel | 365 Days |
2.2 Z8L Diesel 6 STR | 365 Days |
Read More: Mahindra Scorpio N Dimensions
Mahindra Scorpio N Waiting Period in Mumbai
For your convenience, we've detailed the waiting period for each Scorpio N variant available in Mumbai in the table below.
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 168 Days |
2.0 Z2 Petrol (E) | 168 Days |
2.0 Z4 AT Petrol | 168 Days |
2.0 Z4 Petrol | 168 Days |
2.0 Z4 Petrol (E) | 168 Days |
2.0 Z8 AT Petrol | 70 Days |
2.0 Z8 Petrol | 112 Days |
2.0 Z8L AT Petrol | 70 Days |
2.0 Z8L AT Petrol 6 STR | 70 Days |
2.0 Z8L Petrol | 98 Days |
2.0 Z8L Petrol 6 STR | 98 Days |
2.2 Z2 Diesel | 140 Days |
2.2 Z2 Diesel (E) | 140 Days |
2.2 Z4 4WD Diesel | 182 Days |
2.2 Z4 4WD Diesel (E) | 182 Days |
2.2 Z4 AT Diesel | 182 Days |
2.2 Z4 Diesel | 182 Days |
2.2 Z4 Diesel (E) | 182 Days |
2.2 Z6 AT Diesel | 98 Days |
2.2 Z6 Diesel | 140 Days |
2.2 Z8 4WD AT Diesel | 79 Days |
2.2 Z8 4WD Diesel | 112 Days |
2.2 Z8 AT Diesel | 70 Days |
2.2 Z8 Diesel | 112 Days |
2.2 Z8L 4WD AT Diesel | 70 Days |
2.2 Z8L 4WD Diesel | 98 Days |
2.2 Z8L AT Diesel | 70 Days |
2.2 Z8L AT Diesel 6 STR | 70 Days |
2.2 Z8L Diesel | 98 Days |
2.2 Z8L Diesel 6 STR | 98 Days |
Mahindra Scorpio N Waiting Period in Chennai
The table below provides a clear and simple overview of the waiting periods for all Scorpio N variants available in Chennai.
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 630 Days |
2.0 Z2 Petrol (E) | 630 Days |
2.0 Z4 AT Petrol | 665 Days |
2.0 Z4 Petrol | 665 Days |
2.0 Z4 Petrol (E) | 665 Days |
2.0 Z8 AT Petrol | 735 Days |
2.0 Z8 Petrol | 735 Days |
2.0 Z8L AT Petrol | 140 Days |
2.0 Z8L AT Petrol 6 STR | 140 Days |
2.0 Z8L Petrol | 490 Days |
2.0 Z8L Petrol 6 STR | 490 Days |
2.2 Z2 Diesel | 630 Days |
2.2 Z2 Diesel (E) | 630 Days |
2.2 Z4 4WD Diesel | 665 Days |
2.2 Z4 4WD Diesel (E) | 665 Days |
2.2 Z4 AT Diesel | 665 Days |
2.2 Z4 Diesel | 665 Days |
2.2 Z4 Diesel (E) | 665 Days |
2.2 Z6 AT Diesel | 735 Days |
2.2 Z6 Diesel | 735 Days |
2.2 Z8 4WD AT Diesel | 735 Days |
2.2 Z8 4WD Diesel | 735 Days |
2.2 Z8 AT Diesel | 490 Days |
2.2 Z8 Diesel | 735 Days |
2.2 Z8L 4WD AT Diesel | 140 Days |
2.2 Z8L 4WD Diesel | 490 Days |
2.2 Z8L AT Diesel | 140 Days |
2.2 Z8L AT Diesel 6 STR | 140 Days |
2.2 Z8L Diesel | 490 Days |
2.2 Z8L Diesel 6 STR | 490 Days |
Check out: Mahindra Scorpio N Mileage
Mahindra Scorpio N Waiting Period in Ghaziabad
Check out the expected waiting period for each Scorpio N variant available in Ghaziabad.
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 365 Days |
2.0 Z2 Petrol (E) | 90 Days |
2.0 Z4 AT Petrol | 365 Days |
2.0 Z4 Petrol | 365 Days |
2.0 Z4 Petrol (E) | 90 Days |
2.0 Z8 AT Petrol | 365 Days |
2.0 Z8 Petrol | 365 Days |
2.0 Z8L AT Petrol | 365 Days |
2.0 Z8L AT Petrol 6 STR | 365 Days |
2.0 Z8L Petrol | 365 Days |
2.0 Z8L Petrol 6 STR | 365 Days |
2.2 Z2 Diesel | 365 Days |
2.2 Z2 Diesel (E) | 90 Days |
2.2 Z4 4WD Diesel | 365 Days |
2.2 Z4 4WD Diesel (E) | 90 Days |
2.2 Z4 AT Diesel | 365 Days |
2.2 Z4 Diesel | 365 Days |
2.2 Z4 Diesel (E) | 90 Days |
2.2 Z6 AT Diesel | 365 Days |
2.2 Z6 Diesel | 365 Days |
2.2 Z8 4WD AT Diesel | 365 Days |
2.2 Z8 4WD Diesel | 365 Days |
2.2 Z8 AT Diesel | 365 Days |
2.2 Z8 Diesel | 365 Days |
2.2 Z8L 4WD AT Diesel | 365 Days |
2.2 Z8L 4WD Diesel | 365 Days |
2.2 Z8L AT Diesel | 365 Days |
2.2 Z8L AT Diesel 6 STR | 365 Days |
2.2 Z8L Diesel | 365 Days |
2.2 Z8L Diesel 6 STR | 365 Days |
Mahindra Scorpio N Waiting Period in Hyderabad
The table below provides a comprehensive breakdown of the expected waiting periods for different Scorpio N variants available in Hyderabad.
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 665 Days |
2.0 Z2 Petrol (E) | 540 Days |
2.0 Z4 AT Petrol | 700 Days |
2.0 Z4 Petrol | 700 Days |
2.0 Z4 Petrol (E) | 540 Days |
2.0 Z8 AT Petrol | 735 Days |
2.0 Z8 Petrol | 735 Days |
2.0 Z8L AT Petrol | 630 Days |
2.0 Z8L AT Petrol 6 STR | 630 Days |
2.0 Z8L Petrol | 630 Days |
2.0 Z8L Petrol 6 STR | 630 Days |
2.2 Z2 Diesel | 665 Days |
2.2 Z2 Diesel (E) | 540 Days |
2.2 Z4 4WD Diesel | 700 Days |
2.2 Z4 4WD Diesel (E) | 540 Days |
2.2 Z4 AT Diesel | 700 Days |
2.2 Z4 Diesel | 700 Days |
2.2 Z4 Diesel (E) | 540 Days |
2.2 Z6 AT Diesel | 735 Days |
2.2 Z6 Diesel | 735 Days |
2.2 Z8 4WD AT Diesel | 735 Days |
2.2 Z8 4WD Diesel | 735 Days |
2.2 Z8 AT Diesel | 735 Days |
2.2 Z8 Diesel | 735 Days |
2.2 Z8L 4WD AT Diesel | 630 Days |
2.2 Z8L 4WD Diesel | 630 Days |
2.2 Z8L AT Diesel | 630 Days |
2.2 Z8L AT Diesel 6 STR | 630 Days |
2.2 Z8L Diesel | 630 Days |
2.2 Z8L Diesel 6 STR | 630 Days |
Mahindra Scorpio N Waiting Period in Gurgaon
Refer to the table below for a detailed waiting period for each Scorpio N variant in Gurgaon.
Scorpio N Variants | ACKO Drive’s Waiting Period* |
---|
2.0 Z2 Petrol | 90 Days |
2.0 Z2 Petrol (E) | 90 Days |
2.0 Z4 AT Petrol | 90 Days |
2.0 Z4 Petrol | 90 Days |
2.0 Z4 Petrol (E) | 90 Days |
2.0 Z8 AT Petrol | 90 Days |
2.0 Z8 Petrol | 90 Days |
2.0 Z8L AT Petrol | 90 Days |
2.0 Z8L AT Petrol 6 STR | 90 Days |
2.0 Z8L Petrol | 90 Days |
2.0 Z8L Petrol 6 STR | 90 Days |
2.2 Z2 Diesel | 90 Days |
2.2 Z2 Diesel (E) | 90 Days |
2.2 Z4 4WD Diesel | 90 Days |
2.2 Z4 4WD Diesel (E) | 90 Days |
2.2 Z4 AT Diesel | 90 Days |
2.2 Z4 Diesel | 90 Days |
2.2 Z4 Diesel (E) | 90 Days |
2.2 Z6 AT Diesel | 90 Days |
2.2 Z6 Diesel | 90 Days |
2.2 Z8 4WD AT Diesel | 90 Days |
2.2 Z8 4WD Diesel | 90 Days |
2.2 Z8 AT Diesel | 90 Days |
2.2 Z8 Diesel | 90 Days |
2.2 Z8L 4WD AT Diesel | 90 Days |
2.2 Z8L 4WD Diesel | 90 Days |
2.2 Z8L AT Diesel | 90 Days |
2.2 Z8L AT Diesel 6 STR | 90 Days |
2.2 Z8L Diesel | 90 Days |
2.2 Z8L Diesel 6 STR | 90 Days |
*Subject to availability or till the stocks last.
Disclaimer: The waiting times listed are rough estimates. The actual period could be shorter or longer depending on where you live, which model you want, manufacturing schedules, and customer demand. Check with your local Mahindra dealership for the latest, real-time details on when to expect delivery.
Frequently Asked Questions