Maruti Suzuki Fronx Waiting Period
Last year, with 134,735 units sold, the compact SUV was the second best-selling premium Nexa model in FY2024 behind the Baleno.
Several factors influence the waiting period for the Maruti Suzuki Fronx in 2025. High demand remains a key reason, as the Fronx continues to attract buyers due to its stylish design, fuel efficiency, and competitive pricing. With Maruti Suzuki's widespread popularity in India, the demand often exceeds production capacity, leading to longer wait times.
Additionally, the availability of specific variants plays a role—higher-end models or those with turbo engines and automatic transmissions may have longer waiting periods due to limited production volumes. Maruti Suzuki prioritises production depending on demand trends, but fluctuations in supply can result in unpredictable delays.
Maruti Suzuki Fronx Waiting Period in Delhi
The Maruti Suzuki Fronx waiting period in Delhi is somewhere between two months. The estimated number of days customers in Delhi have to wait for the Fronx is presented in the table below:
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 42 Days |
1.0 Alpha Turbo AT | 70 Days |
1.0 Delta Plus Turbo | 70 Days |
1.0 Zeta Turbo | 42 Days |
1.0 Zeta Turbo AT | 70 Days |
1.2 Delta | 42 Days |
1.2 Delta AGS | 42 Days |
1.2 Delta CNG | 42 Days |
1.2 Delta Plus | 42 Days |
1.2 Delta Plus AGS | 70 Days |
1.2 Sigma | 42 Days |
1.2 Sigma CNG | 42 Days |
Check out: Maruti Suzuki Fronx Variants
Maruti Suzuki Fronx Waiting Period in Gurgaon
The following table is a detailed compilation of the waiting period for the Maruti Suzuki Fronx based on its twelve variants in Gurgaon.
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 42 Days |
1.0 Alpha Turbo AT | 70 Days |
1.0 Delta Plus Turbo | 70 Days |
1.0 Zeta Turbo | 42 Days |
1.0 Zeta Turbo AT | 70 Days |
1.2 Delta | 42 Days |
1.2 Delta AGS | 42 Days |
1.2 Delta CNG | 42 Days |
1.2 Delta Plus | 42 Days |
1.2 Delta Plus AGS | 70 Days |
1.2 Sigma | 42 Days |
1.2 Sigma CNG | 42 Days |
Maruti Suzuki Fronx Waiting Period in Faridabad
Below, we have provided an easy-to-read table highlighting the estimated waiting period for each of the twelve variants of the Maruti Suzuki Fronx in Faridabad.
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 42 Days |
1.0 Alpha Turbo AT | 70 Days |
1.0 Delta Plus Turbo | 70 Days |
1.0 Zeta Turbo | 42 Days |
1.0 Zeta Turbo AT | 70 Days |
1.2 Delta | 42 Days |
1.2 Delta AGS | 42 Days |
1.2 Delta CNG | 42 Days |
1.2 Delta Plus | 42 Days |
1.2 Delta Plus AGS | 70 Days |
1.2 Sigma | 42 Days |
1.2 Sigma CNG | 42 Days |
Also Read: Maruti Suzuki Fronx All Specification
Maruti Suzuki Fronx Waiting Period in Noida
The table below offers customers in Noida planning to buy the Maruti Suzuki Fronx the estimated waiting period for each variant.
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 42 Days |
1.0 Alpha Turbo AT | 70 Days |
1.0 Delta Plus Turbo | 70 Days |
1.0 Zeta Turbo | 42 Days |
1.0 Zeta Turbo AT | 70 Days |
1.2 Delta | 42 Days |
1.2 Delta AGS | 42 Days |
1.2 Delta CNG | 42 Days |
1.2 Delta Plus | 42 Days |
1.2 Delta Plus AGS | 70 Days |
1.2 Sigma | 42 Days |
1.2 Sigma CNG | 42 Days |
Maruti Suzuki Fronx Waiting Period in Ghaziabad
A complete breakdown of the waiting periods for the twelve Maruti Suzuki Fronx variants in Ghaziabad is presented in the table below:
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 42 Days |
1.0 Alpha Turbo AT | 70 Days |
1.0 Delta Plus Turbo | 70 Days |
1.0 Zeta Turbo | 42 Days |
1.0 Zeta Turbo AT | 70 Days |
1.2 Delta | 42 Days |
1.2 Delta AGS | 42 Days |
1.2 Delta CNG | 42 Days |
1.2 Delta Plus | 42 Days |
1.2 Delta Plus AGS | 70 Days |
1.2 Sigma | 42 Days |
1.2 Sigma CNG | 42 Days |
Read More: Maruti Suzuki Fronx Dimensions
Maruti Suzuki Fronx Waiting Period in Bangalore
The table below lists the waiting period for the Maruti Suzuki Fronx in Bangalore. The variant-wise time period is offered below:
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 90 Days |
1.0 Alpha Turbo AT | 90 Days |
1.0 Delta Plus Turbo | 90 Days |
1.0 Zeta Turbo | 90 Days |
1.0 Zeta Turbo AT | 90 Days |
1.2 Delta | 90 Days |
1.2 Delta AGS | 90 Days |
1.2 Delta CNG | 90 Days |
1.2 Delta Plus | 90 Days |
1.2 Delta Plus AGS | 90 Days |
1.2 Sigma | 90 Days |
1.2 Sigma CNG | 90 Days |
Maruti Suzuki Fronx Waiting Period in Mumbai
The exact number of waiting days for the Maruti Suzuki Fronx based on the different variants is outlined in the table given below:
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 56 Days |
1.0 Alpha Turbo AT | 84 Days |
1.0 Delta Plus Turbo | 56 Days |
1.0 Zeta Turbo | 56 Days |
1.0 Zeta Turbo AT | 56 Days |
1.2 Delta | 28 Days |
1.2 Delta AGS | 28 Days |
1.2 Delta CNG | 28 Days |
1.2 Delta Plus | 28 Days |
1.2 Delta Plus AGS | 28 Days |
1.2 Sigma | 28 Days |
1.2 Sigma CNG | 28 Days |
Maruti Suzuki Fronx Waiting Period in Pune
Here are the expected waiting periods for customers in Pune waiting to get their Maruti Suzuki Fronx variant delivered, listed in the detailed table below:
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 45 Days |
1.0 Alpha Turbo AT | 45 Days |
1.0 Delta Plus Turbo | 45 Days |
1.0 Zeta Turbo | 45 Days |
1.0 Zeta Turbo AT | 45 Days |
1.2 Delta | 45 Days |
1.2 Delta AGS | 45 Days |
1.2 Delta CNG | 45 Days |
1.2 Delta Plus | 45 Days |
1.2 Delta Plus AGS | 45 Days |
1.2 Sigma | 45 Days |
1.2 Sigma CNG | 45 Days |
Maruti Suzuki Fronx Waiting Period in Chennai
Below, we have offered an approximation of the waiting times for each of the twelve Maruti Suzuki Fronx variants presently available for customers residing in Chennai in the table below:
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 28 Days |
1.0 Alpha Turbo AT | 28 Days |
1.0 Delta Plus Turbo | 28 Days |
1.0 Zeta Turbo | 28 Days |
1.0 Zeta Turbo AT | 28 Days |
1.2 Delta | 28 Days |
1.2 Delta AGS | 28 Days |
1.2 Delta CNG | 28 Days |
1.2 Delta Plus | 28 Days |
1.2 Delta Plus AGS | 28 Days |
1.2 Sigma | 28 Days |
1.2 Sigma CNG | 28 Days |
Maruti Suzuki Fronx Waiting Period in Hyderabad
The table below offers a comprehensive listing of the variant-wise different waiting periods for the Maruti Suzuki Fronx for customers in Hyderabad.
Variant | ACKO Drive's Waiting Period* |
---|
1.0 Alpha Turbo | 90 Days |
1.0 Alpha Turbo AT | 90 Days |
1.0 Delta Plus Turbo | 90 Days |
1.0 Zeta Turbo | 90 Days |
1.0 Zeta Turbo AT | 90 Days |
1.2 Delta | 90 Days |
1.2 Delta AGS | 90 Days |
1.2 Delta CNG | 90 Days |
1.2 Delta Plus | 90 Days |
1.2 Delta Plus AGS | 90 Days |
1.2 Sigma | 90 Days |
1.2 Sigma CNG | 90 Days |
*Subject to availability or till the stocks last.
Disclaimer: The waiting times listed are rough estimates. The actual period could be shorter or longer depending on where you live, which model you want, manufacturing schedules, and customer demand. Check with your local Maruti Suzuki dealership to get the latest, real-time details on when you can expect delivery.
Frequently Asked Questions